Diệp lâm chi

Hoa Lac – Hoa Binh Road (Phase 1&2)

Constructor:  Cotana Infrastructure (Cotana Group)
Investor: BOT Hoa Lac - Hoa Binh National Highway 6.,Ltd
Contract's value: VND 138 billion
Location: Ky Son district and Hoa Binh city, Hoa Binh province.
 
PHASE 1
 
Investment project on constructing Hoa Lac - Hoa Binh road and renovating, upgrading National Highway 6 in the section of Xuan Mai - Hoa Binh was implemented in the form of BOT. The project aimed to meet the needs of the corridor transport linking the northwestern provinces with Hanoi, improving the service level of highway 6, while increasing the efficiency of operating the Thang Long Boulevard, reducing travel time from Hanoi to Hoa Binh.
Cotana Group participated in the construction of package No. 04XL - Construction of foundations, pavements, works on the road and ensuring traffic safety for the section of Km62 + 00-Km71 + 00 of highway 6 in Xuan Mai - Hoa Binh section. The package has a length of 9km with the starting point of Km62 + 00, adjacent to package 3 in Dan Ha commune, Ky Son district, Hoa Binh province and the last point is Km71 + 00, the end of the route is in the territory of Hoa Binh city, Hoa Binh province.
 
 PHASE 2
 
Cotana Group and Sao Vang Construction JCS jointed name to execute package No. 08XL: Constructing roadbed, road surface, drainage works in section Km9 + 500 -: - Km13 + 050 with a total length of 3.5km.